Share from 0:00
0:00
/

Evacuations Ordered in Palm Bay Estates as the St. Johns River Sets a Record

Boats are moving mandatory-area residents to the Captain's House, a county shelter is open in Cocoa, 20 Palm Bay streets are closed, and about 6.7 inches of rain are still to come.

PALM BAY, FL (The Palm Bayer) — Palm Bay Estates is under evacuation orders on Thursday, November 19, 2026, as the week’s flooding enters a second round on ground that never dried out. The St. Johns River set a record overnight, the county has opened a shelter in Cocoa, and the forecast carries about 6.7 more inches of rain for Palm Bay into early Saturday.

Evacuations: Palm Bay Estates

The City of Palm Bay issued an evacuation notice for Palm Bay Estates on Thursday morning, due to ongoing flooding concerns.

  • Mandatory evacuations are in effect for Palm Bay Estates residents located west of the canal and east of the railroad tracks.

  • Voluntary evacuations are in effect for all remaining areas of Palm Bay Estates; residents are strongly encouraged to consider relocating to a safe location.

  • Palm Bay Police and Palm Bay Fire Rescue are on site with boats to assist residents in the mandatory evacuation area.

  • Residents in the mandatory area are transported by boat to the Captain’s House, where arrangements will be made to relocate them to a shelter.

  • Residents in the mandatory area should follow instructions from emergency personnel and prepare to evacuate immediately.

  • Avoid flooded roadways, and do not attempt to walk or drive through floodwaters.

County shelter open in Cocoa

Brevard County Emergency Management announced Thursday morning that the county has opened a shelter for residents seeking refuge from the rising water, at the Walter Butler Community Center, 4201 N Cocoa Blvd, Cocoa. The shelter is open to the general population, to people with special medical needs, and to families bringing pets. Residents going to the shelter should bring their own supplies, including bedding, needed medications, multiple changes of clothing, and personal hygiene items. Information line: 2-1-1.

Travel: stay off the roads if you can

  • Don Walker, spokesperson for Brevard County Emergency Management: “We’ve got high water on the roads from Pineda Causeway, north. If you don’t have to get on the roads, don’t.”

  • Emergency crews carried out two water rescues overnight, one in Cocoa and one in Rockledge, and at least four well-being checks.

  • The City of Palm Bay’s Thursday morning Facebook post says standing water and flooding are possible on roadways, especially in areas hit by the November 2 flood; no major corridors are currently impassable; drivers should allow extra commute time; never drive or walk through floodwaters; and avoid unnecessary travel during heavy rain. The city’s flood web page still stands at November 12.

  • Roads reported flooded in central and north county reporting: State Road 405; Sarno Road in Melbourne; State Road A1A partly covered at Shearwater Parkway in Satellite Beach; Grissom Parkway; U.S. 1 at south State Road 405; Silver Oak Boulevard; ponding on I-95 near Cocoa; and Kennedy Parkway (SR 3) westbound reduced to one lane near Jerome Road.

  • The geography, stated plainly: the worst of this round fell on central and north Brevard, including Merritt Island, Cocoa, and Rockledge. Palm Bay’s overnight rain was lighter, about 1 to 1.5 inches. Palm Bay’s risk is saturated ground plus the rain still coming.

Street closures in Palm Bay (city update, Thursday 10:00 a.m.)

The City of Palm Bay’s 10:00 a.m. Thursday weather update lists the following street closures. Conditions remain hazardous: do not drive around barricades or attempt to cross flooded roadways. Turn Around, Don’t Drown. The city says it will keep updating its post as conditions change.

  • Port Malabar Road at Vance/Apollo Circle

  • Briar Creek

  • Indian River Drive at Palm Bay Estates

  • 881 Knecht Road

  • Daytona Drive at Bianca Drive

  • Main Street at Hudson Avenue

  • Abbot Avenue west of Badger Drive

  • Bianca Drive at Hampton

  • Port Malabar Road at Daytona Drive

  • Port Malabar Boulevard at US 1

  • Forrest Knoll at Freel

  • Hagdon at San Filippo Drive

  • Cogan Drive at Palo Alto

  • Paramount at San Diego

  • Americana Boulevard at Altamira

  • Di Lido at Americana

  • Emerson Drive at August

  • Evergreen at Burlington

  • Fallon at Ladner

  • Cimarron at Knecht (lift station pump failure reported)

Port Malabar Boulevard has washed out and closed again, days after it reopened following repairs, as FOX 35 Orlando reported; WFTV and WKMG also report the boulevard closed again. The city’s 10:00 a.m. list above carries Port Malabar Boulevard at US 1 among the closures.

The warning stack, Thursday (National Weather Service, Melbourne)

  • Flash Flood Warning, Brevard County, until 9:45 a.m. Thursday.

  • Flood Warning (areal), Brevard County, until 11:00 p.m. Thursday. The warning was extended Thursday morning; an earlier issuance ended at 6:15 p.m.

  • Flood Advisories in effect Thursday morning.

  • Wind Advisory until 10:00 a.m. Thursday.

  • Flood Watch in effect through Friday, November 20, at 7:00 p.m.

  • St. Johns River Flood Warning in effect until further notice, under a separate river product.

The river: a record at Cocoa

  • The St. Johns River near Cocoa measured 17.85 feet at 4:15 a.m. Thursday, above the previous record of 17.6 feet, set in 1953.

  • The crest arrived higher than forecasters had predicted for Saturday. Major flooding is occurring, and the river warning runs until further notice.

The rain still coming

  • Wednesday and overnight totals: almost 12 inches near Satellite Beach on Wednesday; a Brevard County average of 3.4 inches on Wednesday; 6 to 10 inches in 12 hours overnight in central Brevard, with some pockets higher; about 1 to 1.5 inches overnight in the Palm Bay area.

  • The ground remains saturated from the November 1-2 flood, when the Weather Service gauge near Palm Bay recorded a storm total of 22.00 inches.

  • About 6.7 inches are still to come at Palm Bay, from Thursday 7 a.m. through Saturday 7 a.m., in the Weather Service forecast issued Thursday morning. That is roughly two inches more than the previous forecast showed for the core of the event, and the rain now extends into early Saturday.

  • The heaviest block ahead is Thursday from 7 a.m. to 1 p.m., at 1.57 inches.

  • The National Hurricane Center is tracking the offshore system feeding this rain, with a medium chance of subtropical or tropical development.

Forecast rain by six-hour period for Palm Bay. Source: National Weather Service, Melbourne.

Forecast rain by six-hour period for Palm Bay

Forecast by six-hour period for Palm Bay, in inches:

  • Thursday 7 a.m. to 1 p.m.: 1.57

  • Thursday 1 p.m. to 7 p.m.: 1.26

  • Thursday 7 p.m. to Friday 1 a.m.: 1.16

  • Friday 1 a.m. to 7 a.m.: 0.99

  • Friday 7 a.m. to 1 p.m.: 0.78

  • Friday 1 p.m. to 7 p.m.: 0.26

  • Friday 7 p.m. to Saturday 1 a.m.: 0.06

  • Saturday 1 a.m. to 7 a.m.: 0.60

Closures, Thursday, November 19

  • Brevard Public Schools closed Thursday and Friday, November 19 and 20 (Spectrum News 13). Eastern Florida State College closed. Florida Tech closed, offices closed and classes cancelled.

  • Health First Medical Group offices delayed opening until noon Thursday. All Health First labs and all Family Pharmacy locations closed until noon.

  • Parrish Healthcare has temporarily suspended elective procedures on Thursday.

  • Brevard County disposal facilities are closed Thursday due to flooding: the Central Disposal Facility in Cocoa, the Sarno Road facility in Melbourne, and the Mockingbird facility and transfer station in Titusville. The county plans to reopen them Friday, November 20, at 7:30 a.m.

  • The City of Palm Bay said in a Thursday morning post that, due to the closure of all Brevard County landfills, Republic Services is unable to complete its scheduled solid waste collection routes today, Thursday, November 19. Residents whose trash was not collected today should bring their carts back in. Collection schedules for Friday, November 20, are still being determined pending updates on landfill operations.

  • Palm Bay City Hall and city administrative offices are closed to the public today, Thursday, due to ongoing flooding and weather conditions. Utilities after-hours emergency line: (321) 952-3478. Police non-emergency: (321) 726-2400. Emergencies: 911.

  • Brevard County government offices are closed to the public today, Thursday, due to ongoing flooding and unsafe road conditions, including all library locations and the Supervisor of Elections and Tax Collector offices.

  • Kennedy Space Center is open; supervisors were encouraged to allow telework and liberal leave.

The Governor’s order and the federal status

  • Executive Order 26-232, issued November 18, amends Executive Order 26-227 and expands the 2026 Fall Flooding state of emergency to 21 counties. Brevard County has been under the declaration since the original order on November 2; the November 18 order did not newly add Brevard.

  • With a state of emergency in force, Florida’s price-gouging law, section 501.160, Florida Statutes, applies to essential goods and repair services. The Attorney General’s price-gouging hotline is 1-866-966-7226.

  • The state’s request for a federal major disaster declaration was submitted November 9 and asks for Individual Assistance for Brevard households. It is still pending. FEMA has activated nothing for Brevard County, and no FEMA assistance is open.

Help channels

  • Damage self-reports: 3,127 have been filed over 17 days, counted by Brevard County Emergency Management. The county’s CrisisTrack self-report form is still open: https://crisistrack.juvare.com/public/brevardFL/request.html . The form builds the damage count behind the federal decision; it is not an application for assistance.

  • Businesses report separately through FloridaCommerce’s Business Damage Assessment Survey for the 2026 Fall Flooding event, covering physical and economic damage. It is also a count, not an application.

  • For assistance or community resources, dial 211.

Sandbags: the open question

  • No sandbag distribution for Thursday has been announced by the City of Palm Bay or by Brevard County in any source checked Thursday morning. Wednesday’s distribution at the Compound off Bayside Lakes Boulevard, which ran until 6 p.m., weather permitting, was a Wednesday operation. Whether a Thursday distribution will be announced is an open question.

Tonight’s council meeting

  • Tonight’s City Council meeting, Thursday at 6:00 p.m., is still on; no postponement has been announced.

What the city says its crews are doing

  • Public Works crews are pumping down stormwater ponds in flood-prone areas to increase drainage capacity, and are also pumping at the C-1 canal, the city’s stormwater canals, and in neighborhoods as needed. Additional pump stations are on standby.

  • The city’s contractor, Cathcart, remains on site at Palm Bay Estates, continuing stabilization work. Cleanup from the previous flooding continues.

  • Public Works crews have removed approximately 2,800 cubic yards of debris from the Northeast section of the city so far.

  • Palm Bay Fire Rescue has prepared its high-water rescue vehicles, and the Palm Bay Police Department has its SWAT vehicle on standby.

  • The city is coordinating with Brevard County Emergency Management and other partners.

  • The city says Public Works and Parks staff filled and distributed more than 10,000 sandbags in the 48 hours before Wednesday evening.

Resident guidance, from the city’s release

  • Avoid flooded roadways, and never drive through standing water.

  • Follow public safety instructions.

  • Residents who need assistance or community resources can call 211.

This story is also published at The Palm Bayer.

Discussion about this video

User's avatar

Ready for more?