MAJOR TRAFFIC ALERT 🚧: Upcoming Road Closures in Palm Bay
Utility Construction 🚧 to Affect NW Palm Bay
Palm Bay, FL — Residents and commuters in northwest Palm Bay should prepare for traffic disruptions starting next week. Pike Construction, a contractor working on behalf of Florida Power & Light (FPL), will conduct utility operations on Pace Drive.
Key Details
Location: Pace Dr, between Jupiter Blvd NW and Waikiki Ave NW
Closure Dates: March 10–14, 2025
Daily Hours: 9:00 AM to 3:30 PM
Detour Method: Standard Flagging (FDOT603)
Plan additional travel time and drive with extra caution ⚠️ through construction zones.
Extended Road Closure in SE Palm Bay 🏗️
A significant road closure is also underway in southeast Palm Bay, lasting several months due to utility drainage improvements. Weldon Street will be fully closed between Wabash Road and Tharp Road.
Key Details
Location: Weldon St, between Wabash Rd and Tharp Rd
Closure Dates: March 6–June 18, 2025
Reason: Culvert replacement and drainage construction
Motorists should find alternate routes and expect increased traffic on nearby streets during this extended closure period.
Need Assistance? For questions or more information about these closures, contact Palm Bay Public Works at (321) 952-3438.
Curated by AI and fact-checked by The Palm Bayer.